GTT has received an order from the Korean shipyard Samsung Heavy Industries (SHI), concerning the tank design of two 180,000m3 LNGCs, on behalf of ship-owner CELSIUS TANKERS.
GTT will design the tanks of the vessels, which will be fitted with the Mark III Flex membrane containment system, a technology developed by GTT. The deliveries of the ships are planned during the second quarter of 2021.
Philippe Berterottière, chairman and CEO of GTT, declared: "We are very pleased to receive this new order from SHI, which confirms CELSIUS TANKERS’ entry into the LNG industry, whom we are pleased to accompany, once more, with our technology."